Ocean Test

164 frames of animation

1 frame rendered on:

system A: 2 minutes on a 3.1GHz i7 iMac, 16 GB ram

system B: 5 minutes on 3GHz i5-4590S PC, 8 GB ram

all 164 frames rendered on 15 system B computers. total time = 54.6 minutes. (5 minutes * 164 frames)/15 = 54.6 minutes.

time if  164 frames were rendered on single system B computer = 13.6 hours

time if 164 frames were rendered on 15 system A computers = 22 minutes

time if 164 frames were rendered on single system A computer = 5.5 hours

 

Leave a Reply

Your email address will not be published. Required fields are marked *